This is one design that we have for the CD front cover the idea is early in development this is only one idea made from images to experiment with some ideas for the final piece.Monday, 25 January 2010
Friday, 22 January 2010
Shooting schedule
The project will be filmed over three days.
We will use one day to film an parts of the film that are set indoors, these are the easiest scenes to film so there should not be a problem in the process. They also are mainly set in the same places so we can film all of the scenes together.
We will use the second day to film all of the outdoor scenes. These being the harder scenes to film we will need to find the right locations where we want them to be set as we will have to minimise any interruption from third party's.
We will use the third day to film any scenes that did not work or need to be re done. This will allow us to finish everything off or to iron out any continuity errors. Although filming in this way does give the film a higher risk of having continuity errors.
Risk Assessment
Some of the possible risks of filming this project include:
- Filming near roads is risky as there is always the danger of cars as a danger to people taking part in the production.
- Filming on a set of stairs can be dangerous as people can slip and fall down.
- Filming in the cold weather can be hazardous for the production team as they can slip on the ice.
- We must also take the battery on the camera into account as this could slow down the production process if it was to fail on us.
- moving the drum kit into the right position could be a potential risk due to the weight of the kit. As well a some of the legs being a risk to people falling over.
Friday, 15 January 2010
Ending 1
This is one possible ending that we could be using for the video. The editing of the video is still under way so this is not the final piece.
Subscribe to:
Posts (Atom)